Location: | Dallas, TX |
GC: | Balfour Beatty |
Fabricator: | W&W Steel Company |
Architect: | Morphosis / Good Fulton & Farrell |
Engineer: | Datum |
Floor Area: | 162,000 sq. ft. |
Tonnage: | 1,300 Tons |
Comments: | Structural steel plinth structure next to cast in place 8-story concrete structure. The rolling plinth area on the south east side of the building carried sloping concrete slab on metal deck. The cantilever exterior escalator framing is made up of structural steel. Bosworth Steel Erectors completed all structural steel and miscellaneous metals. |