Location: | Dallas, TX |
GC: | Manhattan Construction |
Fabricator: | Thornton Steel |
Engineer of Record: | Brockette-Davis-Drake Inc |
Architect of Record: | Beck Architecture |
Floor Area: | 90,000 sq. ft. |
Roof Area: | 48,000 sq. ft. |
Tonnage: | 1,800 Tons |
Comments: | The complex steel structure was erected on a first floor concrete platform, incorporating Veirendeel trusses to support the oblong sanctuary roof. A pedestrian bridge, 20 feet above street level, allows church members and visitors easy access to a parking structure across the street. |